What is the outlay of the first phase of the Samudra Manthan scheme approved by the Union Cabinet?
Quiz
Random mix
A fresh set from the whole question bank · 10 questions
Score
0 / 0
Which country signed an MoU with Arunachal for India’s first river kinetic energy project?
Up to how many electric seaplanes are covered in the MoU signed by NOEMI Aerospace?
Which scheme was falsely claimed in the fake loan approval letter?
How much administrative cost was sanctioned in the G.O. for the Tamil Nadu gold ring scheme?
To whom did Telangana Chief Minister A. Revanth Reddy recommend the removal of Konda Surekha from the Cabinet?
By December, what rupee level did Nomura project?
What was India’s GDP growth rate in FY27 Q1?
What is the investment value mentioned for the zero-CBAM green industrial campus?
Which two bodies signed the MoU to strengthen cooperation?